Practical steps to migrate applications to the cloud with minimal interruption and predictable cost.
Stage 1 — Discovery & Assessment
- Inventory applications and dependencies (databases, queues, third-party APIs).
- Estimate performance characteristics and peak loads.
- Identify compliance requirements and data residency concerns.
Stage 2 — Strategy & Design
- Decide migration pattern: Rehost, Replatform, Refactor, or Replace.
- Design for high availability zones and backups.
- Define rollback and cutover plans; test restores frequently.
Stage 3 — Security & Governance
- Implement IAM with least-privilege roles.
- Enable encryption at rest and in transit.
- Set up centralized logging and monitoring (CloudWatch/Stackdriver/Elastic).
Stage 4 — Cost Control
- Right-size instances; use reserved or spot instances when appropriate.
- Use autoscaling for workloads that vary.
- Review storage class (S3 standard vs infrequent access).
Stage 5 — Cutover & Validation
- Perform staged cutover (non-peak first).
- Run performance tests and validate data integrity.
- Monitor for errors, latency and cost—keep the rollback plan ready.
Checklist summary
Discovery → Strategy → Security → Cost → Cutover. At every step, involve business owners and test thoroughly.
If you want a migration plan customized to your systems, contact VMB for a migration readiness assessment.

Leave a Reply